鋼筋加工制作技術方案
一、 施工依據
1. 設計圖紙及會審紀要。
2. 《建筑工程施工工藝標準》有關內容。
3. 混凝土結構工程施工及驗收規范GB50204-92。
二、 施工準備
1. 熟悉圖紙,加強自審,發現有問題及時向有關部門反映,以便盡快解決促進施工正常進行。
2. 及時按要求作出施工配料單。配料單要求斷料前2天報到專業技術人員。審核后方可開始斷料。
3. 鋼筋進場后按施工總平面布置圖,及專業工長要求的位置分類碼放整齊,入場前要作好場地清理,墊好木方。
4. 入場的鋼筋按試驗員要求及時取樣交試驗員送試驗室作復試,復試合格后方可加工制作。
5. 各類鋼筋加工機具進場后立即安排人員檢查、就位、試運轉,同設備組辦好交接手續。機具出了問題及時
Steel manufacture technology program
A construction based on
1. Mixed design drawings and summary.
2. "Building Construction Technology Standards" relevant content.
3. Concrete construction and acceptance of GB50204-92.
Second, construction preparation
1. Familiar with the drawings, to enhance self-examination, found the problem in a timely manner to the relevant department in order to facilitate construction as soon as possible to solve the normal.
2. Timely construction of required ingredients to make one. Single-ingredient required to report two days before the breaking of professional and technical personnel. Examination before they can start off material.
3. After entering the construction reinforced by the general layout plans, and professional requirements of the position of foreman classification of laying is neat, clean-up before admission to the venues, good wooden pad.
4. Bar admission requirements in a timely manner in accordance with test sample delivery member of staff sent to laboratory for test retest, retest pass behind the production can be processed.
Five. Various types of steel processing equipment immediately after admission arrangements for staff inspection, in place, commissioning, transfer procedures with the equipment group. Equipment out of the question in a timely manner