XX醫院大樓工程施工方案.doc
進入下載頁
一、施工方案
1-1工程概況、條件及特點
1-1- 1工程概況
XX工程,建設地點位于X,整個建筑呈一個“X”字形,主樓共X層,第X層屋頂為水箱間、設備用房及電梯機房等,建筑占地面積3100m2,建筑面積為19200 m2,總床位數為500床。建筑高度23.90 m,框架抗震等級為三級,抗震設防烈度為七度,耐火等級為一級,屋面防水等級為一級,工程設計年限為50年。在一層門廳南向入口設有一個“八”字弧形斜坡道,建筑物內設有三臺電梯,均為客梯兼消防電梯,同時考慮殘疾人使用需要。
本工程各層建筑功能分別為:
一層:病房、衛生間、出院結算中心、入院登記中心、急診室、治療室、醫生辦公室等,層高3.60m;
二至六層:病房、衛生間、醫生辦公室、治療室等,層高均為3.30m;
屋頂層:屋頂為水箱間、設備用房及電梯機房等,層高3.30m。
防水工程:本工程防水等級為Ⅰ級,屋面防水采用屋面鋼筋混凝土剛性自防水和卷材防水相結合,防水層采用三元乙丙橡膠防水卷材(有保溫隔熱層),面貼陶瓷地磚。
大樓外裝飾主要為:外墻漆。
內裝飾主要為:樓地面:水泥砂漿找平地面;內墻柱:混合砂漿外刮白色904仿瓷涂料三遍;頂棚:混合砂漿外刮白色904仿瓷涂料三遍。
本工程采用鋼筋混凝土框架結構體系,獨立柱基礎和部分人工挖孔樁基礎;管道井、電梯井、樓梯間采用240mm厚MU10粘土磚M5混合砂漿砌筑;±0.000以下采用240mm厚MU10粘土磚M5水泥砂漿砌筑;內隔墻采用140mm厚MU7.5混凝土空心砌塊M7.5混合砂漿砌筑。
本工程鋼筋采用Ⅰ--Ⅱ級鋼筋,鋼筋接頭優先采用焊接,焊接時優先采用閃光對焊,二級鋼筋焊接采用E43焊條;
結構構件主筋保護層厚度如下表所示:(單
A construction program
1-1 Project Overview, conditions and characteristics
1-1 - 1 Project Overview
XX engineering, construction, located at X, the building was an "X" shape, the main building of X layer, the first X layer roof water tanks, the equipment room and elevator machine room, etc., construction area of 3100m2, construction area of 19200 m2, The total number of beds to 500. Building height of 23.90 m, the framework of seismic rating of 3, the seismic intensity is 7 degrees, fire resistance rating for a roofing grade level, the project design life of 50 years. To the south entrance hall on the first floor has an "eight" the word curved ramps, the building is equipped with three elevators, lifts are elevators and fire, taking into account the needs of people with disabilities.
Architectural features of the project levels, respectively:
Floor: room, bathroom, hospital billing center, the admission centers, emergency rooms, treatment rooms, doctors offices, floors 3.60m;
Two to six: wards, toilets, medical offices, therapy rooms, floors are 3.30m;
Roof level: roofs, water tanks, the equipment room and elevator machine room, etc. storey 3.30m.
Waterproof: Waterproof rating of the project grade Ⅰ, reinforced concrete roofing used roofing and waterproofing membrane waterproofing of rigid combination of waterproof layer of EPDM waterproofing membranes (with thermal insulation layer), ceramic floor tiles Sticking .
Main outside the building decoration: outside wall paint.
Mainly in decoration: the ground floor: cement floor leveling; Interior Column: 904 mixed mortar outside the white melamine paint scratch three times; roof: mixed mortar outside scraping white melamine paint three times 904.
The project reinforced concrete frame structure, the foundation and part of pole man Drilled Pile Foundation; tube wells, elevator shafts, stairwells with 240mm thick MU10 brick masonry mortar mix M5; ± 0.000 below with 240mm thick clay brick M5 MU10 cement mortar lining; within the wall with 140mm thick hollow concrete block M7.5 MU7.5 masonry mortar mix.
The project reinforced by Ⅰ - Ⅱ grade steel, welded steel joints given priority, the priority use of flash butt welding, two steel welding electrode with E43;
The thickness of the reinforcement, protection of structural members as shown below: (Single