        HZS35B×2攪拌站安裝與施工方案.doc

        更新時間: 2024-02-18
        下載權限: 免費會員
        文件大小: 0.01 MB
        文件類型: .doc
        瀏覽次數:
        上傳會員: lajks
        所屬欄目: 施工方案
        進入下載頁
        資料簡介

        HZS35B×2攪拌站安裝與施工方案
        一、 概述
        鑒于大學城指揮部指定供應我標段的長興混凝土攪拌站所供應的混凝土量明顯不能滿足現時的需求量,為緩解大學城建設混凝土需求高峰期的供應強度、保證工程的進度和工期,落實《穗學指辦字[2003]130號》文件的精神,我司擬在施工區域內建立混凝土現場攪拌站。此攪拌站主要供應藥科樓、工科樓的混凝土需求量和作為其他棟號的應急后備,每小時產量為40m3。
        二、 攪拌站的平面布置
        本攪拌站擬建在在建教學區內,位于藥科樓、工科樓和教學區A線道路之間(位置詳見總平面圖)。攪拌站內的機械、設備、材料堆場的具體位置和車進出方向等詳見(平面布置圖)。所需的水池、添加劑池和排水溝的位置和做法詳見平面布置圖中注釋。攪拌機位置搭設簡易上蓋。
        三、 人員及機械配置
        1、 人員配置
        本攪拌站按其運作要求配置:主管1人;機長1人;操作人員4人;鏟車司機2人;質量管理員2人,共10人。
        2、 機械配置
        本攪拌站主要的機械設備配置如下:抽水泵機2臺(配時間繼電器);配料機2臺(配計量控制系統);攪拌主機2臺(型號:
        HZS35B × 2 mixing plant installation and construction plan
        I. Introduction
        In view of University City headquarters designated supply me tender by Changxing Concrete supplied the concrete mixing station obviously can not meet existing demand, to alleviate the construction of University City, the supply of concrete strength of the peak demand, ensure the progress and schedule to implement " Studies that do ear [2003] No. 130, "document the spirit of our company to be established within the construction area on-site mixing of concrete. This mixing of the major suppliers Pharmaceutical floor, engineering floor, concrete demand and other buildings as emergency back-up number, output per hour 40m3.
        Second, mixing station layout
        The mixing station to be built in the area of teaching in the building, located Pharmaceutical floor, engineering floor, and teaching area A line of road between (see the overall plan here). Mixing the machinery, equipment, materials storage yard location and vehicle access to the specific direction see (floor plan). The required pool, pool and drain additive location and floor plans of the practice see the Notes. Location erection simple mixer cover.
        Third, personnel and mechanical configuration
        1, staffing
        The mixing station configuration according to their operational requirements: 1 person in charge; captain 1; operators 4; forklift driver 2; Quality Manager 2, a total of 10 people.
        2, machine configuration
        The main mechanical mixing device configuration is as follows: 2 sets of pumps machine (with relay); dosing machine 2 (with metering control systems); Mixer 2 sets (Model:
         