        暗龍骨吊頂工程施工方案.doc

        更新時間: 2024-02-18
        下載權限: 免費會員
        文件大小: 0.02 MB
        文件類型: .doc
        瀏覽次數:
        上傳會員: lajks
        所屬欄目: 施工方案
        進入下載頁
        資料簡介

        一、材料要求:
        1輕鋼龍骨分U形和T形龍骨兩種,并按荷載分上人和不上人兩種。
        2 輕鋼骨架主件為大、中、小龍骨;配件有吊掛件、連接件、插接件。
        3 零配件:有吊桿、角碼、絲桿和螺母、射釘、自攻螺釘。
        4 按設計要求選用罩面板,其材料品種、規格、質量應符合設計要求。
        二、主要機具:
        電動機具:電鋸、無齒鋸、手電鉆、沖擊電錘、電動螺絲刀、電焊機。
        手動機具:射釘槍、拉鉚槍、氣動直釘槍、氣動碼釘槍、手鋸、手刨子、鉗子、扳子、水準儀、靠尺、鋼卷尺等。
        三、作業條件:
        1工前應熟悉現場、圖紙及設計說明。
        2計要求對房間的凈高、洞口標高和吊頂內的管道、設備及其支架的標高進行交接檢驗。
        3收記錄和復驗報告。
        4設備安裝完成。罩面板安裝前,上述設備應檢驗、試壓驗收合格。
        5面板安裝前,墻、柱面裝飾基本完成,涂料只剩最后一遍面漆并經驗收合格。
        四、操作工藝:
        (一)工藝流程:
        1, material requirements:
        A U-shaped metal frame points and two T-shaped keel, and press the load points on the two kinds of people and not the Master.
        Two main pieces of light steel frame for large, medium and small keel; accessories are hanging pieces, connector, connectors.
        Three parts: a boom, corner, screw and nut, nail, tapping screws.
        4 According to the design chosen Zhaomian Ban, its material type, specifications, quality should meet the design requirements.
        Second, major equipment:
        Motor with: saw, no tooth saws, electric drill, impact hammer, electric screwdriver, electric welding machine.
        Manual machines: nail gun, pull rivet gun, pneumatic nail gun straight, pneumatic nail gun code, hand saw, hand plane, pliers, wrench, level, by foot, steel tape measure, etc..
        Third, the operating conditions:
        1 should be familiar with the site before work, drawings and design description.
        2 meter clearance height requirements of the room, entrance level and ceiling inside the pipe, equipment and support the elevation for the transfer test.
        3, collection records and re-inspection report.
        4 equipment installed. Zhao Mianban Before installation, the equipment should be tested, test pressure acceptance.
        5 panel pre-installation, wall, decorative cylinders basically completed, paint finish and only the final again and passes.
        4, the operation process:
        (1) process:
         