        1.工程概況
        本工程結構使用的鋼筋有HPB235、PRB400兩種規格鋼筋。
        鋼筋工程是結構工程質量保證中的重要一環,施工過程中要把住材質、鋼筋翻樣及下料、焊接、機械連接、綁扎、錨固、搭接、保護層厚度的質量關和成品保護關,確保鋼筋工程的質量。
        2.施工準備
        (1)做好鋼筋施工的技術交底和鋼筋翻樣下料工作。
        (2)根據施工進度計劃組織鋼筋進場,并要求鋼材供應商隨車提供鋼材出廠合格證及數量。
        (3)鋼筋加工必須在規定的范圍內進行,焊接人員必須經持證上崗。
        (4)做好機械連接及焊接鋼筋接頭的試驗工作,對于機械連接及焊接連接方式須經試驗合格后方可在工程中投入使用。
        3.鋼筋材質的檢驗、堆放
        (1)材質
        進場鋼筋應兩證一單齊全,鋼筋上的標牌爐號應與材質報告單相符,鋼
        1. Project Overview
        Structural steel used in this project have HPB235, PRB400 two kinds of reinforcement.
        Steel structure project quality assurance project is an important part in the construction process should live material, like steel turning and cutting, welding, mechanical connection, lashing, anchorage, overlapping, protective layer to protect the quality and finished off to ensure the quality of steel works.
        2. Construction preparation
        (1) do the technical disclosure of reinforced construction and steel-like materials in the work of translation.
        (2) According to the construction schedule bar admission organizations, and asked to provide attendant steel suppliers and steel factory certificate number.
        (3) steel processing must be carried out within the limits prescribed, welding personnel must be certified.
        (4) good mechanical connection and welded steel joint experimental work, the mechanical connection and welded connections subject to trial only after passing into use in the project.
        3. Reinforced materials testing, stacking
        (1) Material
        Approach should be two cards of a single steel complete steel heat number on the sign should be consistent with the materials of a single steel
         