“P°ÍÎÛË®ÌáÉý±ÃÕ¾‰ºÃÜ×¢{Ê©¹¤·½°¸.doc
ßMÈëÏÂÝdí“
Ò»¡¢ ǰÑÔPreface
ÎÛË®ÌáÉý±ÃÕ¾‰ºÃÜ×¢{Ö÷Ҫᘌ¦Æä»ù¿Óµ×°åϲ¿µÄ¼s1.8mºñµÄ·ÛÍÁ£¬ÒòÆäµ×°å³ÊëAÌݲ¿£¬²¿·ÝÍÁów»¬„Ó£¬Ôì³É²¿·Ýµ×°åÅcÆäϲ¿·ÛÍÁµÄ·Öëx£¬¶øÐγɿն´£¬Ä¿Ç°Í¨ß^¬F(xi¨¤n)ˆö¿±²ì£¬ÒòÆÆ‰ÄÌŽžé16×3×1.8m¡£Òò¶øÒªÇó²ÉÓÃ×¢{·½Ê½ßMÐÐÍÁów¼Ó¹Ì¡£This plan is mainly aimed at about 1.8m THK powder soil in the bottom slab of foundation pit. As the bottom slab is in a step and part of the soil is slided, some slabs are separated from the powder soil. So the hollows turn up. After the site investigation, as the broken area is 16*3*1.8m, method of grouting should be adopted for the soil strengthening.
¶þ¡¢ ‰ºÃÜ×¢{·½·¨Methodology for Compaction and Grouting
Ô“¹¤³Ì»ù¿Óµ×°å¬F(xi¨¤n)ÒѲע³É¹¦£¬ÒÀ“þ(j¨´)¬F(xi¨¤n)ˆöµÄÆÆ‰Ä³Ì¶È¼°ÒÔÍùµÄÊ©¹¤½›(j¨©ng)òž£¬ÏÈͨß^È˹¤·½Ê½ÔÚµ×°åé_¿×£¬È»ºóÒÀ“þ(j¨´)Ë®»Ò±È0.5~0.6µÄ·½°¸ßMÐД‡°èË®Äà{£¬ÔÙŒ¢”‡°è¾ù„òµÄË®Äà{ÓÙCе·½Ê½Ý”Èë¿×¶´ÖУ¬ÒÑß_(d¨¢)µ½¼Ó¹ÌµØ»ùÍÁžéÄ¿µÄ¡£The bottom slab in foundation pit has been successfully placed. According to the damage degree and our construction experience, firstly we will make hole by manpower, secondly mix cement mortar in a water cement ratio of 0.5~0.6. Then cement mortar will be conveyed into holes by machine to meet the requirement.
