上海南匯污水處理廠擴建工程-樁基工程施工方案.doc
進入下載頁
目 錄
一、工程概況
二、施工方案編寫依據
三、工程地質條件
四、項目管理組織機構及技術力量配備
五、樁基施工部署及主要設備配備
六、周圍環境及沉樁施工中采取的防護措施
(一)、樁基施工對環境的影響機理
(二)、周圍環境情況
七、沉樁施工的質量保證措施
(一)、施工準備
(二)、樁的驗收、起吊、搬運和堆放等
(三)、施工放樣
(四)、沉樁的順序及工藝要求
(五)、沉樁質量控制
(六)、接樁與送樁
(七)、施工記錄
(八)、中間驗收和竣工驗收
八、樁基施工各工種崗位職責
九、施工進度計劃及保證措施
(一)、施工進度計劃
(二)、保證工程進度計劃的措施
十、各項資源需用量計劃
(一)、勞動力需用量計劃
(二)、施工設備需用量計劃
(三)、主要材料需用量計劃
十一、施工技術組織措施
(一)、保證工程質量的技術措施
(二)、保證工程質量的組織措施
十二、安全技術組織措施
(一)、安全技術組織措施
(二)、施工現場臨時用電安全措施
(三)、施工防火安全措施
十三、文明施工保證措施
十四、特殊情況下的施工
十五、原河堤防護措施
十六、附圖表
附圖表-1、沉樁工序流程圖
附圖表-2、施工管理網絡圖
CONTENTS
First, project survey
Second, the preparation of construction scheme based on
Third, engineering geological conditions
Fourth, project management, organization and technology with
5, pile foundation construction and major equipment, with deployment
6, the surrounding environment and Piles protective measures taken
(A), the environmental impact of Pile Foundation Construction Mechanism
(B), the surrounding environmental conditions
7, pile construction quality assurance measures
(A), construction preparation
(B), piles of acceptance, lifting, handling and stacking, etc.
(C), Construction Layout
(D), pile driving and technological requirements of the order
(E), quality control pile
(6), and send the pile pile
(7), construction records
(8), intermediate acceptance and final acceptance
8, the construction of various types of job responsibilities pile
9, construction schedule and the assurance measures
(A), the construction schedule
(B) to ensure that the measures project schedule
10, the amount of resources required to plan
(A), the amount of labor required to plan
(B), the amount of construction equipment required to plan
(C), the major amount of material required to plan
11, construction technology organizational measures
(A), the technical measures to ensure project quality
(B), organizational measures to ensure project quality
12, security technology organizational measures
(A), security technology organizational measures
(B), temporary electrical construction site safety
(C), construction fire safety measures
13, civilized construction assurance measures
14, construction under special circumstances
15, the original river bank protection measures
16, drawings, tables
Photo Table -1, pile driving process flow chart
Table -2 drawings, construction management network map