污水處理(三期)機(jī)電設(shè)備單機(jī)調(diào)試方案.doc
進(jìn)入下載頁
廣州市XXX污水處理廠是廣州市政府制定的全市污水治理總體規(guī)劃中的第一座大型城市污水處理廠,位于廣州市西郊的XXX上,總占地面積為25公頃。第一期日處理規(guī)模15萬m3/d于1989年投產(chǎn),第二期日處理規(guī)模15萬m3/d于1996年投產(chǎn),占地面積約14公頃。采用A2/O生物脫氮除磷處理工藝,2000年進(jìn)行處理能力3萬m3/d的挖潛改造工程,總處理規(guī)模達(dá)到33萬m3/d。三期工程是大坦沙污水處理廠一、二期工程的延續(xù)和拓展,處理規(guī)模是22萬m3/d,處理后污水排放標(biāo)準(zhǔn)符合國家和廣東省污水排放的一級(jí)出水標(biāo)準(zhǔn),是廣州市政府的
XXX sewage treatment plant in Guangzhou City, Guangzhou municipal government of the city's wastewater treatment master plan in the first large-scale municipal wastewater treatment plant, located in the western suburbs of Guangzhou City, XXX, the total area of 25 hectares. The first deal with the scale of maturity 150 000 m3 / d in 1989 and put into operation, the second dealing with the scale of maturity 150 000 m3 / d in 1996 and put into operation, covering an area of about 14 hectares. With A2 / O biological nutrient removal treatment process, capacity of 2000 to 30,000 m3 / d on innovation projects, the total deal size to 330,000 m3 / d. Phase III is Datansha Wastewater Treatment Plant, Phase II continuation and expansion of treatment scale is 220,000 m3 / d, the treated effluent discharge standards in line with national and Guangdong Province, the level of effluent discharge standards, the Guangzhou City Government