1. 施工準備
1.1 認真熟悉施工圖紙和設計要求,按照施工規定和技術要求做好各項準備工作。
1.2 作好進場材料的準備和檢查。
1.2.1 衛生器具要全部檢查,應有出廠合格證及安裝技術說明。
1.2.2 衛生器具的型號、規格、色澤應符合設計;外觀檢查應:成型端正,表面光滑,無裂紋和破損,色調一致,邊緣平滑。
1.2.3 衛生器具的配件應與器具配套,質量可靠,外表檢查應:表面光滑,鍍層均勻、完整,螺紋清晰,間隙適當,無砂眼、裂紋。
1.3 安裝條件
1.3.1 供水管道和排水管道應合乎要求。
1.3.2 配合土建施工預埋件的埋設位置正確。
1.3.3 除浴缸,蹲便器配合土建施工外,其它器具應在室內裝修基本完成后進行。
2. 操作工藝要點
2.1 安裝要求
2.1.1 衛生器具安裝,宜用預埋螺栓、膨脹螺栓固定
1. Construction preparation
1.1 Construction drawings and design seriously familiar with the requirements of the regulations and technical requirements for construction and do the preparatory work.
1.2 prepare material preparation and examination approach.
1.2.1 sanitary ware to all inspection certificate should be manufactured and installed technical description.
1.2.2 Health and apparatus models, specifications, color should be consistent with the design; visual inspection should be: correct shape, the surface smooth, without cracks and damage, color consistency, edge smoothness.
1.2.3 Health and accessories of apparatus and equipment should be complete, reliable, and appearance inspection to be: smooth, uniform coating, complete, clear thread, clearance fit, no blisters, cracks.
1.3 Installation conditions
1.3.1 water supply pipes and drainage pipes should meet the demand.
1.3.2 with the civil construction of embedded parts buried in the correct position.
1.3.3 In addition to Bath, squatting pan with civil construction, other utensils should be basically completed in the interior decoration after.
2. Operation process elements
2.1 Installation requirements
2.1.1 Health and appliances installed, it is appropriate embedded bolts, expansion bolts