電廠(2×450MW)主廠房工程1#、2#汽輪發電機基礎工程施.doc
進入下載頁
目 錄
一、編制依據………………………………………………01
二、工程概況………………………………………………01
三、施工準備………………………………………………01
1.技術準備……………………………………………01
2.原材料準備…………………………………………01
3.機械設備準備………………………………………02
4.勞動力準備…………………………………………02
四、分布分項工程操作要點………………………………02
1.汽機基礎定位、放線及沉降觀測…………………02
2.鋼筋工程……………………………………………03
3.架子工程……………………………………………04
4.預埋件、預埋螺栓、預埋套管、預留洞的
安裝固定……………………………………………04
5.模板工程……………………………………………06
6.砼工程………………………………………………07
五、質量檢驗標準…………………………………………10
六、安全組織技術措施……………………………………10
七、質量保證技術措施……………………………………11
八、文明施工及成品保護…………………………………12
附圖一 施工網絡計劃圖……………………………14
附圖二 沉降觀測點平面布置圖……………………15
附圖三 底板鋼筋支撐圖……………………………16
附圖四 12.60米運轉層梁上部雙排筋固定支撐圖…17
附圖五 底板柱插筋加固鋼管支撐圖………………18
附圖六 大塊模板拼接及鐵件安裝圖………………19
附圖七 預埋件AP -1507~1511安裝固定圖………20
附圖八 預埋套管SL-1500、SL-1511安裝固定圖…21
附圖九 梁柱對拉螺栓加固圖………………………22
附圖十 基礎底板砼澆筑示意圖……………………23
附圖十一 行走式塔吊平面布置圖……………………24
附圖十二 2#汽機基礎垂直施工縫留設剖面圖………25
附圖十三 2#汽機基礎運轉層垂直施工縫留設圖……26
附圖十四 2#汽機基礎6.27m夾層垂直施工縫 留設圖………………………………………27
附圖十五 基礎底板溫度監測點平面布置圖……………28
附圖十六 汽機運轉層溫度監測點平面布置圖…………29
CONTENTS
First, the preparation according to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
Second, project profiles ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
Third, construction preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
1. Technical preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
2. Raw material preparation ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 01
3. Machinery and equipment ready to ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 02
4. The labor to prepare ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 02
Fourth, the distribution sub-project operation points ... ... ... ... ... ... ... ... ... ... ... ... 02
1. Steam turbine foundation for positioning, pay-off and settlement observation ... ... ... ... ... ... ... 02
2. Reinforced engineering ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 03
3. Shelf engineering ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 04
4. Embedded parts, embedded bolts, embedded casing, the hole reserved
Fixed ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 04
5. Template Project ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 06
6. Concrete Engineering ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 07
5, the quality inspection standards ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 10
6, the Organization for Security Measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... 10
7, quality assurance, technical measures ... ... ... ... ... ... ... ... ... ... ... ... ... ... 11
8, civilized construction and finished to protect ... ... ... ... ... ... ... ... ... ... ... ... ... 12
Photos of a construction network plan ... ... ... ... ... ... ... ... ... ... ... 14
Photo 2 Settlement Observation floor plan ... ... ... ... ... ... ... ... 15
Photo 3 floor bar spanner ... ... ... ... ... ... ... ... ... ... ... 16
Photo 4 12.60 m run double layer of the upper beam fixed support bar chart ... 17
Photo 5 floor support columns Reinforcing Steel Reinforcement Chart ... ... ... ... ... ... 18
Six large photo mosaic and iron template installation diagram ... ... ... ... ... ... 19
Photo 7 embedded parts AP -1507 ~ 1511 fixed map ... ... ... 20
Photo 8 embedded tube SL-1500, SL-1511 fixed plans ... 21
Photo 9 column bolt reinforcement plan ... ... ... ... ... ... ... ... ... 22
Photo 10 of the base diagram Pouring ... ... ... ... ... ... ... ... 23
Photo 11 walking tower crane floor plan ... ... ... ... ... ... ... ... 24
Photo 12 2 # steam turbine foundation construction joints located vertical profiles of ... ... ... 25
Photo 13 2 # operation of steam turbine foundation layer of vertical construction joints located Chart ... ... 26
Photo 14 2 # steam turbine foundation 6.27m vertical construction joints located laminated chart ... ... ... ... ... ... ... ... ... ... ... ... ... ... ... 27
Photo 15 of the base temperature monitoring floor plan ... ... ... ... ... 28
Photo 16 turbine operating surface temperature monitoring floor plan ... ... ... ... 29